Liberty Lagoon Phase II Expansion
Southeast Engineers was the prime consultant for the Phase II expansion of Liberty Lagoon Water Park
in Baton Rouge, Louisiana. We were tasked with the design of the following phase II areas:
- Vertical Architecture and Structural Design of:
- New Restroom/Concession Amenity Building
- New mechanical/pump house for Phase II aquatics
- Aquatic Rides
- Flowrider Unit
- 2-Flume Thrill Slide
- All hydraulic design for recirculation and water supply systems
- Civil Site Design
- Two elevated retaining wall seating areas
- Over 22,000 square feet of new swimming pool deck
- Secondary entrance design
- Drainage design
- Miscellaneous Site Furnishings
The project was constructed by Wharton-Smith, Inc. and began construction in 2016 with an anticipated completion in 2017. The project was able to maintain schedule and open for the 2017 season to serve the Baton Rouge Area. Southeast Engineers will continue to serve the Baton Rouge area with their aquatic venue design needs.
DATE
2016
CLIENT
Parks and Recreation Commission for the Parish of East Baton Rouge (BREC)
PROJECT TYPE
Commercial Aquatics
CONTRACTOR
Wharton-Smith, Inc.
Project Liberty Lagoon Phase II Expansion




Contact Southeast Engineers
Residential and Commercial Engineering
Structural Design
Civil Site Design
Aquatic Venue Design
Building Forensics
"*" indicates required fields
About Southeast Engineers
Southeast Engineers is a market leader in a wide range of engineering services. From engineering design to plan development, permitting, and construction management, Southeast Engineers has the expertise and commitment to assure success in commercial, residential, and site development projects.
Contact Southeast Engineers
Southeast Engineers
4880 Bluebonnet Blvd, Suite A
Baton Rouge, LA 70809
Lafayette
345 Doucet Road #102, Lafayette, Louisiana 70503